- October 10, 2024
Another great project competed at The Ashford Designer Outlet. This time our task was to take one larger unit and divide it into two separate units. We are receiving more and more requests for projects of this nature where landlords are capturing new clients by offering smaller retail spaces within their sites.
Given our knowledge of the site we completed the works on time and within budget. A small amount of strip out work was required to remove the existing storage system, flooring and making safe the incoming services so that they could be subdivided.
In brief the works carried out:
- Separate all services such as electric, HVAC & sprinklers into two separate supplies for the two separate units
Strip out existing partition walls
Remove existing racking
Install a new division partion – 2-hour fire wall
Remove all floor coverings
Install a new flooring were required
Create a new self-contained storage area
Revamp communal areas with hold back fire doors, CCTV, floor latex & foyer vinyl lining
Dig out and install new water/waste drainage to existing mains
All the works completed by our inhouse teams who really do know the finer workings of this site now. Hand over to the new tenants for their own fitout contractors to complete.