AW Rail Wye Station Staff Provison
Jason Stokes
AW Rail - AW Corrosion Works
AW Rail West Worthing Station Repairs
AW Rail Safety Staff Provision
AW Rail Vegetation Services

AT A GLANCE

Project Type Labour Supply
Client Various
Completion Date 10/06/2022
Project Size Labour Supply
Project Manager Anthony Buckley

BRIEF DESCRIPTION

Here at AW Rail Services, we are often asked to provide operatives to cover a multitude of works for other rail contractors. All our staff are fully trained and qualified, often having many years of experience in the rail industry. We excel at this sort of staff provision, and this is why we do it.

Here one of our senior staff members, Anthony Buckley, acting as Competent Person (COSS)  along with our Site Supervisor Sam Sharpe are at Wye railway station overseeing  MEWP works (along with operatives) for a client that needed access to the upper parts of the building for refurbishment of windows, fascia’s and other areas requiring attention.

Across the network we can provide all manner of staffing:

  • Safety Critical staff (COSS etc)
  • Strapping Teams
  • Engineering Supervisors
  • Handback Engineers
  • Bricklayers
  • Skilled Labourers (PASMA Ops / Small Tools Trained)
  • General Labour (hump and bumpers)
  • Safety Critical staff (COSS etc)
  • Painters (ICAT / ICORR) – Metal Structures
  • Tradesmen for Fit Out Works (Carpenters / Shop Fitters / Tilers / Carpenters)
  • IPAF Operators (MEWP Works)

This is just a small part of the services that we provide here at AW Rail -please do get in touch with any of our staff for any further information you may require or a general informal chat about a project that you may need assistance with.

  • Over the years you and your team have supplied Keltbray with various high skilled staff who have conducted themselves very well in every situation and have worked up a rapport with some site staff from Keltbray meaning they are on first name basis and are specifically asked for on future works. Staff sometimes move around at the last minute to accommodate cancelled or last-minute shifts, without much complaint or hassle. The office staff we deal with on a day-to-day basis bend over backwards to cover whatever we throw at them, nothing is ever an effort or issue for the guys to deal with and to be fair they usually deal with a lot of last minute requests from our side most weeks. We have a great relationship with the guys which has been built up over several years and long may it continue.

    JAMIE MOORE
    Assistant Resource Manager - Keltbray
© Copyright 2024 AW Rail Services Limited AW Construction Services Limited by AW Group